Towers |
1 |
Floors |
24 |
Units |
601 |
Total Project Area |
0.41 acres (1.66K sq.m.) |
FOUNDATION Isolated/ Combined footing SUPER STRUCTURE RCC Framed structure using Aluminium Form Work / Pre-cast Technology BLOCK WORK solid concrete block where ever required FLOORING Waiting lounge /reception /GF Lobby /lift lobby – Marble/Granite/ Vitrified Tiles Staircases all floors – Concrete step tiles/Vitrified tiles / Epoxy coating for precast stairs (from 1st floor) Other lift Lobby and corridors (upper) – Vitrified tiles (Matt Finish) MEP room – IPS floor with smooth finish Terrace – clay tile with water proofing Basement – IPS with smooth finish Living / Dining / Family / Foyer – Vitrified tiles Master Bed room – Vitrified tiles Other Bed rooms – Vitrified tiles Balcony / deck – Matt finish tiles Master Bed room toilet – Anti-skid ceramic tiles Common Toilet – Anti-skid ceramic tiles Kitchen – Vitrified tiles WALL DADO Kitchen – provision for modular kitchen. Surface prepared for glazed tile upto 2′ height (above platform) M.bedroom toilet – Ceramic tile cladding up to false ceiling height. Common Toilet – Ceramic tile cladding up to false ceiling height. KITCHEN Counter – provision for modular kitchen Plumbing & Electrical – Plumbing point provision for water purifier, washing machine. Electrical points provision for water purifier, refrigerator, hob, chimney, mixer/grinder, Microwave Oven, Washing Machine TOILETS CP Fittings – Jaquar/Ess Ess/ Essco or equivalent Sanitary fixtures – Floor mounted white EWC (Hindware/Parryware/ Cera or equivalent) with exposed flush tank of standard make including health faucet. Accessories – towel rod False Ceiling – Grid ceiling Calcium silicate or equivalent DOORS Main entry door – to unit – Flush shutter with both side Laminate and architrave Bedroom doors – Engineered & Treated Hard wood frame & particle board with hdf skin and architrave Toilet door – Engineered & Treated Hard wood frame, Shutter laminated both sides and architrave Balcony door – UPVC/Aluminium with bug screen 2 track with one side fixed panel. Shaft door – MS door frame with mild sheet shutter RAILING Balcony railing – MS railing Stair Railing – (Common areas) MS railing WINDOWS UPVC/ Anodised Aluminium with mosquito mesh provision and safety grill PAINTING & FINISHES a) Exterior finish – Combination of External texture paint with external grade emulsion b) Internal ceilings common area – Oil Bound Distemper or Emulsion lift Lobby – Oil Bound Distemper or Emulsion staircase, utility area and service area – Oil Bound Distemper or Emulsion basement – Cement paint/Oil bound distemper unit ceiling – acrylic emulsion paint c) Internal walls common area – emulsion paint lift Lobby – emulsion paint staircase, utility area and service area – Oil bound distemper basement – Cement paint unit walls – acrylic emulsion paint d) steel works synthetic enamel paint e) woodwork Enamel paint WATER SUPPLY/DRAINAGE CPVC for water supply a) Sewage Line – UPVC b)Water supply – Treatment WTP External piping – UPVC Internal piping – CPVC Flushing – STP treated water c) Drainage – Treatment- STP External piping – PVC Internal piping – PVC AIR CONDITIONING Master Bedroom Provision (16A switch & socket point with wiring for spilt AC) ELECTRICAL Apartment 3 bhk – 5 KW 2 bhk – 4 KW 1 bhk – 3 KW Modular switches – Anchor or equivalent make. DG Backup 2-KW for 3 BHK,1.5-KW for 2 BHK, 1KW for 1 BHK, Emergency power for lifts, pumps & lighting in common areas –