Towers |
5 |
Floors |
26 |
Units |
810 |
Total Project Area |
5.84 acres (23.63K sq.m.) |
Open Area |
84 % |
1 FOUNDATION Isolated/ Combined footing/Raft 2 SUPER STRUCTURE RCC structure using Aluminium formwork. 3 BLOCK WORK 4 FLOORING Waiting lounge /reception /GF Lobby /lift lobby Marble /Granite/Vitrified Tiles Staircases Concrete Step tiles Other lift Lobby and corridors (upper) vitrified tiles 600mmx600mm (Matt Fiish) Service lift lobby vitrified tiles 600mmx600mm (Matt Finish) MEP rooms IPS floor with smooth finish Terrace clay tiles Over water proofing Basement VDF/IPS with smooth finish FLOORING Living / Dining / Family / Foyer Vitrified tiles 600mmx600mm (double charged) Master Bed room laminated wooden flooring Other Bed rooms Vitrified tiles 600mmx600mm (double charged) Balcony / deck Anti skid ceramic tiles. Master Bed room toilet Ceramic tiles Other Toilets Ceramic tiles Kitchen and Utility Vitrified tiles 600mmx600mm (double charged) 5 WALL DADO Kitchen Provision for modular kitchen. M.bedroom toilet Glazed/Ceramic tile cladding up to false ceiling bottom. Other toilets Glazed/Ceramic tile cladding up to false ceiling bottom. 6 KITCHEN a. Counter Provision for modular kitchen b. Plumbing/Electrical Plumbing: Provision for Aqua Guard/sink,washing machine Electrical: 16 amps – 2 no.s (washing machine,microwave oven), 6amps – 6 no.s(Fridge/hob/chimney/aquaguard/mixer,Instant Gyser) 7 TOILETS: CP Fittings Jaguar/ Ess Ess or equivalent Sanitary fixtures wall mounted white EWC (Hindware/equivalent) with exposed flush tank of standard make including health faucet. Accessories- Soap tray, concealed diverter,toilet paper holder,basin mixer, robe hook,towel rod,health faucet. Shower Wall Mixer for shower (Jaguar/ Ess Ess or equivalent); Countertops M.Bathroom- Granite counter, other bathrooms- Ready made counter with wash basin False Ceiling Calcium silicate/Sintex 8 DOORS: Main entry door – to unit Hardwood frame with designer shutter (masonite or equivalent) Bedroom doors Hardwood frame with painted flush shutter Toilet door Hardwood frame with painted flush shutter Utility N.A. Balcony door UPVC/Aluminium with bug screen 2 1/2 track Shaft door MS door frame with steel shutter 9 RAILING Balcony railing MS railing Stair Railing (Common areas) MS railing 10 WINDOWS UPVC/anodised Aluminium with bug screen and safety grill 11 PAINTING and FINISHES a) Exterior finish External texture paint with external grade emulsion b) Internal ceilings common area OBD lift Lobby OBD staircase, utility area and service area OBD basement cement paint unit ceiling OBD c) Internal walls common area emulsion paint lift Lobby emulsion paint staircase, utility area and service area OBD basement cement paint unit walls acrylic emulsion paint d) steel works synthetic enamel paint e) woodwork Enamel Paint 12 WATER SUPPLY/DRAINAGE a) Sewage Line UPVC b)Water supply Treatment – WTP External piping CPVC/UPVC Internal piping CPVC Flushing STP treated water c) Drainage Treatment -STP External piping PVC/UPVC Internal piping PVC/UPVC 13 AIR CONDITIONING Living Provision (16A switch and socket point with Wiring for Split AC.) M.Bedroom Provision (16A switch and socket point with Wiring for Split AC.) Other Bedrooms Provision (16A switch and socket point with Wiring for Split AC.) 14 ELECTRICAL 3 BHK 6KW 2.5 BHK 5KW 2 BHK 4KW 1 BHK 3KW Transformer capacity As per design DG CAPACITY As per design Modular switches Anchor Roma or equivalent make DG Backup* 3-KW for 3 BR, 3 KW for 2.5 BHK, 2KW – 2BR ,1KW – 1BHK 15 VERTICAL TRANSPORTATION Lifts provided As per design 16 SECURITY SYSTEM and AUTOMATIONS provision for Intercom Facility/ CCTV as per design 17 LANDSCAPING yes 18 GAS SUPPLY* On subscription basis 19 WARDROBES NA 20 SUSTAINABILITY Solar water heater Only for top 2 floors Organic waste converter Yes Ground water recharging Yes Rain water storage Yes Street light Yes STP Yes 21 Car parking As per Byelaw